This is the view of the building from Lamberton Road, prior to any modifications. |
|
|
|
|
Installation of a sewer line to the new restrooms and kitchen. |
The new walls starting to go up. |
The water distribution system and the hot water tank which was moved from the rear of the building. |
The Dispatch Room showing the raised flooring in white. |
The coffered ceiling in the Dispatch Room. |
A partial shot of the Equipment Room while still empty. |
This is a shot from above the Dispatch Room, with the kitchen to the right. |
Looking from the front door in to the Conference/Training Room. |
Boring the caissons for the 160' tower. |
Clearing the 36" auger. |
Looking through the Equipment Room to the outside door. |
The Conference/Training Room is still being used for staging. |
The nearly complete Dispatch Room. The black squares are acoustic panels, which reduce echoes in the room. |
A detail of the coffered ceiling. |
The kitchen is also nearly complete. |
Vendors installing equipment at the Dispatch positions. |
Part of the LAN network wiring going to the Dispatch positions. |
The LAN patch panel, partially interfaced. |
Miller Communications installing a temporary tower for the radio links. |
Miller Communications and Morlan Construction in the early stages of erecting the 160' tower. |
Tim Miller and Richard (last name unknown) of Miller Communications installing cross braces. |
Tower sections pre-assembled and waiting for a crane to install them. |
The pre-assembled sections again. There are 2 more sections to assemble. |
| Last updated 01/06/09 | Page 2 |